Cedar to Ipe in East Hampton, Boards and Steps (2 of 2)

The job
Part 2 stays on top of the same East Hampton deck: the ipe laid out to the sliders, and the steps boarded in the same ipe.
This is part 2 of 2. Part 1 covers taking the cedar off, repairing the Douglas fir frame, and laying ipe over the skirted joists.
flowchart TB classDef office fill:#eff5f8,stroke:#547d91,color:#262626 classDef process fill:#eaf8f4,stroke:#1abc9c,color:#262626 classDef reader fill:#f3f3f3,stroke:#8a8a8a,color:#262626 s0["Douglas fir frame repaired in part 1"] s1["Ipe laid to the sliders"] s2["Steps boarded in the same ipe"] s3["Finished deck and steps"] s0 --> s1 --> s2 --> s3 class s0 office class s1,s2 process class s3 reader
How it works
This picks up on the Douglas fir frame we repaired in part one.


We ran the ipe out to the sliders and boarded the steps in the same ipe.


Result
The deck is ipe now, out to the sliders and down the steps, on the frame from part 1.
Materials and tools
- Ipe
- Douglas fir (frame, part 1)