Design + Build

Design + Build

Cedar to Ipe in East Hampton, Boards and Steps (2 of 2)

Residential

The job

Part 2 stays on top of the same East Hampton deck: the ipe laid out to the sliders, and the steps boarded in the same ipe.

This is part 2 of 2. Part 1 covers taking the cedar off, repairing the Douglas fir frame, and laying ipe over the skirted joists.

flowchart TB
  classDef office fill:#eff5f8,stroke:#547d91,color:#262626
  classDef process fill:#eaf8f4,stroke:#1abc9c,color:#262626
  classDef reader fill:#f3f3f3,stroke:#8a8a8a,color:#262626

  s0["Douglas fir frame repaired in part 1"]
  s1["Ipe laid to the sliders"]
  s2["Steps boarded in the same ipe"]
  s3["Finished deck and steps"]
  s0 --> s1 --> s2 --> s3

  class s0 office
  class s1,s2 process
  class s3 reader

How it works

This picks up on the Douglas fir frame we repaired in part one.

We ran the ipe out to the sliders and boarded the steps in the same ipe.

Result

The deck is ipe now, out to the sliders and down the steps, on the frame from part 1.

Materials and tools

  • Ipe
  • Douglas fir (frame, part 1)